HANSA-FLEX
CountryBranch finderAssistance and contactX-CODE Manager|
HANSA-FLEXCompanyReferencesConstruction

Construction

Construction equipment works in dust, sand and constant impact. We keep it running.

Challenges on site

1

Dust, sand and impact

Hose covers abrade, leading to seepage and burst pressure loss.

2

Constantly moving equipment

Machines are not in one place — failures happen on site, not in the workshop.

3

Every hour of downtime costs

Construction schedules depend on a handful of key machines.

Our solutions

1

Abrasion-resistant hoses and cover protection

Abrasion-resistant covers, protective sleeves and anti-kink coils for moving positions.

2

24/7 mobile service on site

Service vans carry hose, fittings and a crimping machine — hose lines replaced on the spot.

3

X-CODE hose identification

Every hose line has its own code: exact reorder in minutes, with no re-measuring.

4

Scheduled preventative maintenance

Regular inspection of the whole fleet, replacing hoses before failure rather than after.

Need advice for your system?

The HANSA-FLEX Vietnam engineering team is ready to survey your site and propose a suitable solution.

+84 932 539 968Send an enquiry