
An old system still running does not mean it should be left alone.
Many plants run hydraulic systems designed for the needs of ten years ago: consuming more energy than necessary, pipework patched through many repairs, and no drawing that matches reality any more.
We survey the existing state, propose a modernisation and carry it out — from replacing a pipe run to planning and managing a complete plant project.
Reviewing the existing system, replacing outdated units, optimising sizing and energy use.
From concept to handover: drawings, materials, schedule and site supervision.
After the work you hold documentation matching the installation — the basis for all later maintenance.
Correct sizing and layout reduce pressure losses.
Materials, assembly and installation are not split between parties.
Prepared in advance so the on-site scope is as short as possible.
The HANSA-FLEX Vietnam engineering team is ready to survey your site and propose a suitable solution.