HANSA-FLEX
CountryBranch finderAssistance and contactX-CODE Manager|
HANSA-FLEXCompanyReferencesMining and tunnel construction

Mining and tunnel construction

High pressure, rock dust and confined spaces — safety is the precondition.

Challenges in this industry

1

Very high pressure

Drilling and support equipment work at the highest pressure ranges.

2

Fire risk underground

Unsuitable materials are a serious safety risk.

3

Confined working space

Hose replacement underground takes far longer than on the surface.

Our solutions

1

Extremely high-pressure hoses

Multi-layer steel reinforcement for the most severe pressure ranges.

2

Flame-resistant materials

Hose covers meeting flame-resistance requirements for underground work.

3

Pre-assembled kits

Complete sets prepared on the surface; underground work is assembly only.

Need advice for your system?

The HANSA-FLEX Vietnam engineering team is ready to survey your site and propose a suitable solution.

+84 932 539 968Send an enquiry